In a tense standoff at the Bali Hai Pier in South Pattaya, an unapproved one-story structure is now at the center of a high-stakes legal disagreement. Determining 21.85 × 3.30 meters and running as a dining establishment on the busy Bali Hai Pier bypass roadway, the structure is dealing with impending demolition after being built without correct permission from regional authorities.
On Friday, Aug 4, a group of authorities led by Suriya Kaeokhiao, the director of Structure Control, and Kris Chertsuriya, the Head of the Working Group, came down upon the website, totally prepared to perform the demolition order. The order, released by Pattaya City under the Structure Control Act of 1979, was served on July 7, 2022, and required that the structure owner send an ask for building and construction adjustment within 45 days. Failure to comply would lead to the structure’s demolition within 1 month from the date of the notification, with the substantial expense of 168,900 Baht to be borne by the owner.
Nevertheless, what was anticipated to be an uncomplicated procedure became a remarkable twist. The structure owner, whose identity stays concealed, emphatically declined to abide by the demolition and rather chose to challenge the order through legal opportunities. The owner submitted a problem versus the contrasting order released by the authorities, raising doubts about the legality of the demolition itself. In addition, the owner lodged a different grievance versus Pattaya City, implicating them of unlawfully getting in the personal property without correct permission.
The taking place legal disagreement has actually developed an environment of unpredictability and stress, leaving the fate of the unapproved structure hanging in the balance. Both celebrations included appear unwavering in their decision to look for justice through the court system, additional making complex the circumstance. The result of the legal procedures might depend upon the analysis of the law and the proof provided by the contrasting celebrations.
In action to the continuous legal fight, city authorities have actually briefly suspended their prepare for instant demolition, deciding to wait for additional advancements in the event. In the meantime, the unapproved structure stands as a concrete sign of the contrasting interests at play.